Mining-Waste-ESG-DEMO

Platinum Node / Anglo American Amplats

← Back to Location

AMP-Q1-R26TBKGeneral Solid

Manifest field review — inspect, correct, and verify extracted data.

Field Review & Data Integrity

All Verified

Core Fields

Collection Date

02 Mar 2026

Generator Site

Unki Mine

Waste Category

Construction Rubble

Volume (t)

22.4

Disposal Method

Recycling

Facility Destination

Interwaste Midrand

Regulatory

SAWIS Code

GW-415

GHS Classification

hazardous only

Not provided

UN Hazard Code

hazardous only

Not provided

Original Raw Unstructured Description

"Q1 2026 batch 45w"

Transport Journey

Unki Mine
Interwaste Midrand
873.6 kmroad est.

Source Ingest Batch

File

Amplats_Q1_2026_To_Date.csv

Type

CSV

Records

72

Status

COMPLETED
View Full Batch