Mining-Waste-ESG-DEMO

Platinum Node / Anglo American Amplats

← Back to Dashboard

Unki Mine

IRMA 75 · 2021MINE

Anglo American's Zimbabwe PGM operation. First mine globally to complete an IRMA on-site audit.· Zimbabwe

First-ever IRMA on-site audit (2021). Surveillance audit completed 2024 — confirms maintained performance without re-scoring.

View on OSM ↗

ZW2L Rate

91.2%

19.8 t to landfill

Hazardous Load

33.7 t

Classified toxic/effluent waste

Total Volume

224.4 t

Total tonnage for Unki Mine

IRMA Certification

IRMA 75

Audited 2021 · SCS Global

Raw Processed Manifests

Manifest IDCategoryTypeTonnageDisposal MethodZW2LClass/GHS
AMP-Q1-38DI05Timber & PackagingGeneral18.75Recovery (RDF)ZW2L ✓N/A
AMP-Q1-IP0UB9General Office WasteGeneral8.48RecyclingZW2L ✓N/A
AMP-Q1-R26TBKConstruction RubbleGeneral22.40RecyclingZW2L ✓N/A
AMP-Q1-SK4D8WGeneral Office WasteGeneral13.47RecyclingZW2L ✓N/A
AMP-Q1-9ZLSZ2Scrap MetalGeneral18.46RecyclingZW2L ✓N/A
AMP-2025-48N7DMSpent SolventsHazardous7.64IncinerationZW2L ✓GHS02 (Flammable)
AMP-2025-93SV7KConstruction RubbleGeneral15.72RecyclingZW2L ✓N/A
AMP-2025-00EQJVGeneral Office WasteGeneral11.65RecyclingZW2L ✓N/A
AMP-2025-TCM8QXScrap MetalGeneral18.96RecyclingZW2L ✓N/A
AMP-2025-SD8R75Construction RubbleGeneral19.81LandfillLandfillN/A
AMP-2025-VYRPRXScrap MetalGeneral12.16RecyclingZW2L ✓N/A
AMP-2025-8ZAU5BMedical Waste (Clinic)Hazardous8.23IncinerationZW2L ✓GHS06 (Toxic)
AMP-2025-FOC6I5Industrial Process WaterGeneral10.35Water Recovery SystemZW2L ✓N/A
AMP-2025-91U4Y7Refuse Derived Fuel (RDF)General10.47Waste-to-EnergyZW2L ✓N/A
AMP-2025-NZ7XHBAcidic SludgeHazardous8.95Chemical TreatmentZW2L ✓GHS05 (Corrosive)
AMP-2025-N5WPO1Timber & PackagingGeneral10.03Recovery (RDF)ZW2L ✓N/A
AMP-2025-VAV2T5Tailings Runoff WaterHazardous8.92Effluent Treatment PlantZW2L ✓GHS09 (Environmental)