Mining-Waste-ESG-DEMO

Platinum Node / Anglo American Amplats

← Transport

Waterval Smelter

SMELTER

Transport CO₂e for this generator site · View waste profile ›

Total CO₂e

4,2 t

4 166 kg CO₂e

Tonne-km

67 186

17 manifests

Avg Journey

163 km

average trip distance

CO₂ Intensity

10,3 kg/t

CO₂e per tonne of waste

Disposal Routes

Waterval Smelter → destination facilities

Interwaste Germiston

167.3 km · 5 trips

1 145 kg

18 472 tkm

Maluti Waste Treatment Facility

167.9 km · 4 trips

1 088 kg

17 551 tkm

Interwaste Midrand

157.8 km · 3 trips

823 kg

13 276 tkm

Klinkerstene Waste Park

207.9 km · 2 trips

729 kg

11 761 tkm

PPC Cement — Hercules

125.2 km · 2 trips

258 kg

4 169 tkm

AfriSam Cement Kiln — Roodepoort

115.1 km · 1 trip

121 kg

1 958 tkm

Monthly CO₂e Trend

Rolling 12 months for this site

May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr

CO₂e by Waste Category

Which streams drive the highest transport footprint

Construction Rubble
888 kg81,8 t waste
E-Waste (Sensors/PCB)
716 kg69,1 t waste
Spent Solvents
556 kg53,4 t waste
Acidic Sludge
533 kg51,2 t waste
General Office Waste
464 kg46,4 t waste
Industrial Process Water
366 kg28,4 t waste
Scrap Metal
263 kg25,4 t waste
Timber & Packaging
258 kg33,3 t waste
Refuse Derived Fuel (RDF)
121 kg17,0 t waste

Hazardous Split

Hazardous

1 804 kg CO₂e

43,3% · 7 manifests

General

2 361 kg CO₂e

56,7% · 10 manifests

Full Site Profile

Distances are OSRM road estimates. Emission factor: 0.062 kg CO₂e/tonne-km (DEFRA 2023, articulated HGV). Scope 3 Category 4.