Platinum Node / Anglo American Amplats
Mototolo Complex
MINEIRMA 75 · 2024Transport CO₂e for this generator site · View waste profile ›
Total CO₂e
15,4 t
15 389 kg CO₂e
Tonne-km
248 206
29 manifests
Avg Journey
383 km
average trip distance
CO₂ Intensity
23,8 kg/t
CO₂e per tonne of waste
Disposal Routes
Mototolo Complex → destination facilities
Interwaste Germiston
398.4 km · 13 trips
6 952 kg
112 126 tkm
Klinkerstene Waste Park
340.6 km · 8 trips
3 670 kg
59 186 tkm
Maluti Waste Treatment Facility
398.5 km · 4 trips
2 497 kg
40 272 tkm
Interwaste WDF Facility
398.4 km · 2 trips
840 kg
13 554 tkm
AfriSam Cement Kiln — Roodepoort
440.5 km · 1 trip
813 kg
13 114 tkm
PPC Cement — Hercules
384.2 km · 1 trip
617 kg
9 955 tkm
Monthly CO₂e Trend
Rolling 12 months for this site
CO₂e by Waste Category
Which streams drive the highest transport footprint
Hazardous Split
Hazardous
6 430 kg CO₂e
41,8% · 12 manifests
General
8 958 kg CO₂e
58,2% · 17 manifests
Distances are OSRM road estimates. Emission factor: 0.062 kg CO₂e/tonne-km (DEFRA 2023, articulated HGV). Scope 3 Category 4.