Platinum Node / Anglo American Amplats
Mogalakwena Mine
MINETransport CO₂e for this generator site · View waste profile ›
Total CO₂e
14,3 t
14 290 kg CO₂e
Tonne-km
230 486
29 manifests
Avg Journey
275 km
average trip distance
CO₂ Intensity
17,1 kg/t
CO₂e per tonne of waste
Disposal Routes
Mogalakwena Mine → destination facilities
Maluti Waste Treatment Facility
284.7 km · 12 trips
5 244 kg
84 582 tkm
Klinkerstene Waste Park
284.9 km · 4 trips
2 484 kg
40 063 tkm
Interwaste Midrand
251.6 km · 3 trips
1 740 kg
28 063 tkm
AfriSam Cement Kiln — Roodepoort
289.7 km · 3 trips
1 702 kg
27 446 tkm
Interwaste WDF Facility
284.1 km · 3 trips
1 389 kg
22 407 tkm
PPC Cement — Hercules
223.2 km · 3 trips
1 007 kg
16 249 tkm
Interwaste Germiston
284.1 km · 1 trip
724 kg
11 677 tkm
Monthly CO₂e Trend
Rolling 12 months for this site
CO₂e by Waste Category
Which streams drive the highest transport footprint
Hazardous Split
Hazardous
7 252 kg CO₂e
50,7% · 16 manifests
General
7 038 kg CO₂e
49,3% · 13 manifests
Distances are OSRM road estimates. Emission factor: 0.062 kg CO₂e/tonne-km (DEFRA 2023, articulated HGV). Scope 3 Category 4.