Mining-Waste-ESG-DEMO

Platinum Node / Anglo American Amplats

← Transport

Bokoni Mine

MINE

Transport CO₂e for this generator site · View waste profile ›

Total CO₂e

5,0 t

5 035 kg CO₂e

Tonne-km

81 213

17 manifests

Avg Journey

384 km

average trip distance

CO₂ Intensity

23,9 kg/t

CO₂e per tonne of waste

Disposal Routes

Bokoni Mine → destination facilities

AfriSam Cement Kiln — Roodepoort

391.5 km · 4 trips

1 317 kg

21 247 tkm

Maluti Waste Treatment Facility

386.5 km · 4 trips

1 167 kg

18 819 tkm

Klinkerstene Waste Park

386.6 km · 3 trips

874 kg

14 092 tkm

Interwaste WDF Facility

385.8 km · 3 trips

830 kg

13 387 tkm

Interwaste Germiston

385.8 km · 2 trips

688 kg

11 096 tkm

PPC Cement — Hercules

324.9 km · 1 trip

160 kg

2 573 tkm

Monthly CO₂e Trend

Rolling 12 months for this site

May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr

CO₂e by Waste Category

Which streams drive the highest transport footprint

Refuse Derived Fuel (RDF)
1 080 kg44,5 t waste
Hydrocarbon Lubricants
830 kg34,7 t waste
Acidic Sludge
617 kg25,8 t waste
Tailings Runoff Water
578 kg24,1 t waste
Spent Solvents
549 kg22,9 t waste
Scrap Metal
412 kg17,2 t waste
Timber & Packaging
397 kg17,7 t waste
Industrial Process Water
295 kg12,3 t waste
E-Waste (Sensors/PCB)
276 kg11,5 t waste

Hazardous Split

Hazardous

2 851 kg CO₂e

56,6% · 10 manifests

General

2 185 kg CO₂e

43,4% · 7 manifests

Full Site Profile

Distances are OSRM road estimates. Emission factor: 0.062 kg CO₂e/tonne-km (DEFRA 2023, articulated HGV). Scope 3 Category 4.