Platinum Node / Anglo American Amplats
Bokoni Mine
MINETransport CO₂e for this generator site · View waste profile ›
Total CO₂e
5,0 t
5 035 kg CO₂e
Tonne-km
81 213
17 manifests
Avg Journey
384 km
average trip distance
CO₂ Intensity
23,9 kg/t
CO₂e per tonne of waste
Disposal Routes
Bokoni Mine → destination facilities
AfriSam Cement Kiln — Roodepoort
391.5 km · 4 trips
1 317 kg
21 247 tkm
Maluti Waste Treatment Facility
386.5 km · 4 trips
1 167 kg
18 819 tkm
Klinkerstene Waste Park
386.6 km · 3 trips
874 kg
14 092 tkm
Interwaste WDF Facility
385.8 km · 3 trips
830 kg
13 387 tkm
Interwaste Germiston
385.8 km · 2 trips
688 kg
11 096 tkm
PPC Cement — Hercules
324.9 km · 1 trip
160 kg
2 573 tkm
Monthly CO₂e Trend
Rolling 12 months for this site
CO₂e by Waste Category
Which streams drive the highest transport footprint
Hazardous Split
Hazardous
2 851 kg CO₂e
56,6% · 10 manifests
General
2 185 kg CO₂e
43,4% · 7 manifests
Distances are OSRM road estimates. Emission factor: 0.062 kg CO₂e/tonne-km (DEFRA 2023, articulated HGV). Scope 3 Category 4.