Mining-Waste-ESG-DEMO

Platinum Node / Anglo American Amplats

← Transport

Amandelbult — Dishaba

MINEIRMA 50 · 2024

Transport CO₂e for this generator site · View waste profile ›

Total CO₂e

8,3 t

8 281 kg CO₂e

Tonne-km

133 559

29 manifests

Avg Journey

261 km

average trip distance

CO₂ Intensity

16,1 kg/t

CO₂e per tonne of waste

Disposal Routes

Amandelbult — Dishaba → destination facilities

Klinkerstene Waste Park

289.8 km · 7 trips

1 953 kg

31 507 tkm

Interwaste Germiston

258.6 km · 7 trips

1 860 kg

29 995 tkm

Interwaste WDF Facility

258.6 km · 4 trips

1 374 kg

22 165 tkm

Maluti Waste Treatment Facility

259.3 km · 5 trips

1 283 kg

20 700 tkm

Interwaste Midrand

239.7 km · 2 trips

799 kg

12 886 tkm

AfriSam Cement Kiln — Roodepoort

237 km · 3 trips

776 kg

12 523 tkm

PPC Cement — Hercules

207.2 km · 1 trip

235 kg

3 783 tkm

Monthly CO₂e Trend

Rolling 12 months for this site

May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr

CO₂e by Waste Category

Which streams drive the highest transport footprint

Hydrocarbon Lubricants
1 374 kg85,7 t waste
General Office Waste
1 143 kg73,4 t waste
Industrial Process Water
1 044 kg58,1 t waste
Scrap Metal
909 kg56,7 t waste
Timber & Packaging
811 kg57,5 t waste
Tailings Runoff Water
724 kg40,3 t waste
Acidic Sludge
696 kg43,3 t waste
Construction Rubble
557 kg35,3 t waste
Medical Waste (Clinic)
392 kg24,4 t waste
E-Waste (Sensors/PCB)
236 kg14,7 t waste

Hazardous Split

Hazardous

3 617 kg CO₂e

43,7% · 13 manifests

General

4 663 kg CO₂e

56,3% · 16 manifests

Full Site Profile

Distances are OSRM road estimates. Emission factor: 0.062 kg CO₂e/tonne-km (DEFRA 2023, articulated HGV). Scope 3 Category 4.