Mining-Waste-ESG-DEMO

Platinum Node / Anglo American Amplats

← Back to Dashboard

Processing Plant

PROCESSING

Ore processing facility.

ZW2L Rate

90.1%

41.0 t to landfill

Hazardous Load

198.5 t

Classified toxic/effluent waste

Total Volume

414.8 t

Total tonnage for Processing Plant

Manifests

16

373.7 t diverted

Raw Processed Manifests

Manifest IDCategoryTypeTonnageDisposal MethodZW2LClass/GHS
AMP-Q1-EGJQMGConstruction RubbleGeneral27.27LandfillLandfillN/A
AMP-Q1-TZEWW4Scrap MetalGeneral17.07RecyclingZW2L ✓N/A
AMP-Q1-QFLXJ8General Office WasteGeneral32.77RecyclingZW2L ✓N/A
AMP-Q1-HA8819Scrap MetalGeneral31.42RecyclingZW2L ✓N/A
AMP-2025-HR0YSUSpent SolventsHazardous32.50IncinerationZW2L ✓GHS02 (Flammable)
AMP-2025-9FZSQJAcidic SludgeHazardous24.14Treatment & DisposalZW2L ✓GHS05 (Corrosive)
AMP-2025-772XGEE-Waste (Sensors/PCB)Hazardous23.98Specialized RecyclingZW2L ✓GHS09 (Environmental)
AMP-2025-OSM4V7E-Waste (Sensors/PCB)Hazardous33.13Specialized RecyclingZW2L ✓GHS09 (Environmental)
AMP-2025-H6UZ4YMedical Waste (Clinic)Hazardous28.48IncinerationZW2L ✓GHS06 (Toxic)
AMP-2025-HIQ4R0Spent SolventsHazardous28.14IncinerationZW2L ✓GHS02 (Flammable)
AMP-2025-VRXTQFGeneral Office WasteGeneral13.75LandfillLandfillN/A
AMP-2025-KLDF7PMedical Waste (Clinic)Hazardous28.15IncinerationZW2L ✓GHS06 (Toxic)
AMP-2025-FS6QEGTimber & PackagingGeneral27.36Recovery (RDF)ZW2L ✓N/A
AMP-2025-DYDY93Construction RubbleGeneral22.56RecyclingZW2L ✓N/A
AMP-2025-DG2NMYGeneral Office WasteGeneral24.59RecyclingZW2L ✓N/A
AMP-2025-8Y4MXUIndustrial Process WaterGeneral19.45Water Recovery SystemZW2L ✓N/A